36-664 - Surfacing LAST AMENDED 6/6/2024 C1 C2 C3 C4 C5 C6 C7 C8 In all districts, as indicated, all permitted or required open off-street loading berths shall be surfaced with asphaltic or Portland cement concrete, or other hard-surfaced dustless material, at least six inches thick.