134-22 - Lot Coverage LAST AMENDED 5/27/2021 For the purposes of determining the permitted #lot coverage# pursuant to this Section, each #building parcel# shall be considered a separate #zoning lot#. Within the Eastern and Western Subareas, the maximum #lot coverage# shall be as set forth in the following table: MAXIMUM LOT COVERAGE height above #base plane# #lot coverage# (in (in feet) percent) Below 60 80 60 to 125 50 above 125 30 In the Open Space Subarea, no #lot coverage# regulations shall apply.