107-03 - Requirements for Certification, Authorization or Special Permit Application LAST AMENDED 11/2/2023 An application to the City Planning Commission for a certification, authorization or special permit respecting a #development#, #enlargement#, or #site alteration# shall include a survey map, prepared by a licensed land surveyor and dated no more than two years prior to the date of filing an application, showing: (a) existing topography at two foot contour intervals; (b) the location of all existing #buildings or other structures# and the location of all proposed #buildings or other structures#; (c) the location of individual existing trees of six inch caliper or more; (d) the location of any elements of the #open space network# on or adjacent to the #zoning lot#; and (e) the location of any #areas of no land alteration#, streams, and natural watercourses; and such other information as may be required by the Commission for its determination as to whether or not the certification, authorization or special permit is warranted.